Category
Finished projects:
Paint production plant
Due to strategic decisions, the complete production equipment will no longer be of use for Teknos. All the equipment needs to be removed from site before the 25th of September 2022. There are multiple mixers, dissolvers, storage tanks, filling equipment en pumps available. The available equipment from our warehouse in Barneveld has all been sold. If you have any questions about this project or would like to talk about a similar project,
Enschede, The Netherlands
Chemical production
50 Machines saved
General information | |
---|---|
Plant type: | Paint production facility |
Industry: | Chemical |
Year built: | 2016 |
Location: | Enschede |
Previous owner: | Teknos B.V. |
Plant size: | 1.000m2 |
Output: | ca. 10.000 Liters per hour |
Currently 664,5 tonnes
of CO2 saved with this
project
See more project pictures
Accelerating regeneration by giving process equipment a second life. Buy and sell certified equipment today!
Embrace a world where innovation, sustainability, and our core values converge seamlessly. discover the empowering experience of working with us.